SB 254A and Oregon’s CMGC Rules Are Overblown

Eric A. Grasberger – June 13, 2013 Oregon Senate Bill 254A and the CMGC method generally garner more attention than is justified. Here is the background. On a typical non-CMGC project, the general contractor will bid on a complete or nearly complete set of design documents. This is referred to as “design-bid-build.” In public construction, competitive bidding is… Continue reading SB 254A and Oregon’s CMGC Rules Are Overblown